Top 10 major upcoming Water Treatment Plant and Manufacturing & Warehousing construction projects - U.S. - October 2021

Top 10 major upcoming Water Treatment Plant and Manufacturing & Warehousing construction projects - U.S. - October 2021

The accompanying tables show the top 10 major upcoming Water Treatment Plant and Manufacturing & Warehousing construction projects in the U.S. They are all in the planning stage and are mainly new projects, but may also involve additions and/or alterations.

Top 10 major upcoming Water Treatment Plant and Manufacturing & Warehousing construction projects - U.S. - October 2021 Graphic

Shopping centers, hotels, office buildings, medical buildings, educational buildings, libraries and museums, sports and entertainment complexes, industrial projects and government buildings will all be covered on a rotating basis.

There are several reasons for highlighting upcoming large projects. Such jobs have often received a fair amount of media coverage. Therefore, people in the industry are on the lookout for when job-site work actually gets underway. And, as showcase projects, they highlight geographically where major construction projects are proceeding.

Finally, total construction activity is comprised of many small- and medium-sized projects and a limited number of large developments. But the largest projects, simply by their nature, can dramatically affect total dollar volumes. In other words, the timing and size of these projects have an exaggerated influence on market forecasts.

Ten of the largest upcoming Water Treatment Plant construction projects

Project Title and
Owner/Developer
Location Current

Stage
Project
Value
U.S. $

millions
SEPTIC TANK PHASEOUT – JACKSONVILLE ELECTRIC AUTHORITY      
JEA (Jacksonville Electric Authority) – Procurement 听Jacksonville FL听 Pre-Design $2,000
HUNTINGTON BEACH WATER DESALINATION FACILITY      
Poseidon Water – Carlsbad 听Huntington Beach CA听 Pre-Design $1,400
RFP CONSTRUCTION MANAGER – BULL RUN FILTRATION FACILITY      
City of Portland – Procurement 听Portland OR听 Construction Documents $650
SMS: RFQ – PUBLIC-PRIVATE PARTNERSHIP (P3) PURIFIED WATER PROJECT      
Santa Clara Valley Water District (SCVWD) 听San Jose, CA听 Pre-Design $600
STRAITS OF MACKINAC TUNNEL CONSTRUCTION – GREAT LAKES 5 PIPELINE REPLACEMENT      
Enbridge Energy LP – Superior 听Mackinaw City MI听 Construction Documents $500
RFQ CONTRACTOR – YAZOO BACKWATER PUMPING PLANT      
US Army Corps of Engineers – Vicksburg District 听Vicksburg MS听 Pre-Design $500
MID-BRETON SEDIMENT DIVERSION – CITY OF PLAQUEMINE      
Coastal Protection and Restoration Authority (CPRA) 听Plaquemine LA听 Pre-Design $488
WATER AND SEWER – US ARMY CORPS OF ENGINEERS      
US Army Corps of Engineers – Vicksburg District 听Lexington MA听 Pre-Design $400
GARDEN HILLS DETENTION BASIN PHASES 2, 3, 4, 5 – CITY OF CHAMPAIGN      
City of Champaign 听Champaign IL听 Pre-Design $400
2020 BOND PACKAGE 1 – CITY OF TEMPE      
City of Tempe 听Tempe AZ听 Pre-Design $350

Ten of the largest upcoming Manufacturing & Warehousing construction projects

Project Title and
Owner/Developer
Location Current

Stage
Project
Value
U.S. $

millions
SAMSUNG AUSTIN SEMICONDUCTOR LLC CHIPMAKING PLANT      
Samsung Austin Semiconductor 听Austin TX听 Construction Documents $17,000
FORMOSA PLASTICS SUNSHINE PROJECT      
Formosa Plastics LA 听Saint James LA听 Construction Documents $9,400
GRON FUELS RENEWABLE DIESEL PLANT      
Fidelis Infrastructure 听Baton Rough LA听 Pre-Design $9,200
SEMPRA ENERGY – LIQUEFIED NATURAL GAS EXPORT TERMINAL – PHASE 1 TRAINS 1 & 2 / PORT ARTHUR      
Sempra Energy 听Port Authur TX听 Construction Documents $9,000
PLAQUEMINES PROJECT      
Venture Global LNG Inc. 听Belle Chasse LA听 Pre-Design $8,500
PTTGC AMERICA ETHANE CRACKER PLANT      
PTTGC America 听Shadyside OH听 Construction Documents $7,500
NACERO GASOLINE MANUFACTURING DEVELOPMENT / ODESSA      
Nacero Inc 听Penwell TX听 Pre-Design $7,000
BLUE OVAL CITY MANUFACTURING FACILITY – FORD MOTOR COMPANY      
Ford Motor Land Development Corporation 听Stanton TN听 Pre-Design $5,700
BLUEOVALSK BATTERY PARK – FORD MOTOR COMPANY      
Ford Motor Land Development Corporation 听Glendale KY听 Pre-Design $5,700
SAMSUNG SEMICONDUCTOR MANUFACTURING FACILITY      
Samsung Semiconductor, Inc. 听Phoenix AZ听 Pre-Design $5,600

All of the above projects share the same common factors. They are all in the planning stage. They are mainly new projects but may also involve additions and/or alterations. Shopping centers, hotels, office buildings, medical buildings, educational buildings, libraries and museums, sports and entertainment complexes, industrial projects and government buildings will all be covered on a rotating basis.
While every effort is made to ensure the correctness of ConstructConnect’s information, we have hundreds of thousands of projects in our database and some errors will occur. We greatly appreciate hearing from readers concerning updates and will make proper revisions promptly.
Data source: ConstructConnect/Tables: ConstructConnect.
Print

Recent Comments (1 comments)

comments for this post are closed

Barbara Stamiris Image Barbara Stamiris

Q. If Enbridge is serious about building a tunnel through the鉂わ笍of the Great Lakes, why is there no plan or $ allocated for it in their 2020 SEC 10k filing? A. The real purpose of the tunnel is to keep old line 5 operating 20+yrs. beyond its 50-year lifetime to earn $1-2million/day despite its shutdown order.

More

You might also like